TheEbenezer News

India·Source-based summary

BDA to start elevated corridor on Ballari Road on Nov.6; traffic to KIA to be disrupted for 18 months

The ₹2,215 crore project involves a cut-and-cover six-lane short tunnel between the Hebbal junction and Veterinary College and an elevated corridor till Mehkri Circle where they will build a rotary flyover

This is a source-based summary, not original reporting by Ebenezer journalists. Source: The Hindu. Ebenezer published 5 Nov 2026, 03:26 pm. Editorial policy.

Read the original report on The Hindu →
The Hindu5 Nov 2026, 03:26 pmUpdated 1h ago1 min readIndiaIndia
BDA to start elevated corridor on Ballari Road on Nov. 6; traffic to KIA to be disrupted for 18 months

India — The Hindu

The ₹2,215 crore project involves a cut-and-cover six-lane short tunnel between the Hebbal junction and Veterinary College and an elevated corridor till Mehkri Circle where they will build a rotary flyover

This report is published with credit to The Hindu. The wire sent a summary; open the original for any extra context. Read on The Hindu →

Source: The Hindu. Published 5 Nov 2026, 03:26 pm.

Keep reading

Back to the desk

Privacy · Terms · Sitemap