India·Source-based summary
BDA to start elevated corridor on Ballari Road on Nov.6; traffic to KIA to be disrupted for 18 months
The ₹2,215 crore project involves a cut-and-cover six-lane short tunnel between the Hebbal junction and Veterinary College and an elevated corridor till Mehkri Circle where they will build a rotary flyover
This is a source-based summary, not original reporting by Ebenezer journalists. Source: The Hindu. Ebenezer published 5 Nov 2026, 03:26 pm. Editorial policy.
Read the original report on The Hindu →
India — The Hindu

