TheEbenezer News

Breaking

After Nepal flash floods, Sikkim group urgesPM Modi to halt hydropower projects

At least 13 hydropower projects along the Bhotekoshi and Trishuli River corridors, including the 111 MW Rasuwagadhi, suffered extensive damage in Nepal

Read full story on The Hindu
The Hindu27 Aug 2026, 02:03 amUpdated 27 min ago1 min readIndiaIndia
After Nepal flash floods, Sikkim group urges PM Modi to halt hydropower projects

IndiaThe Hindu

At least 13 hydropower projects along the Bhotekoshi and Trishuli River corridors, including the 111 MW Rasuwagadhi, suffered extensive damage in Nepal

This report is published with credit to The Hindu. The wire sent a summary; open the original for any extra context. Read on The Hindu

Source: The Hindu. Published 27 Aug 2026, 02:03 am.

Keep reading

Back to the desk
info@ebenezerdigital.com+91 98944 96560WhatsApp